Overnight we have experienced flooding in B Block, the site team and staff have worked tirelessly during the morning so the school can open as planned. However, the flooding has affected the Inclusion Suite, and as a result the Inclusion Suite will be closed today. The Inclusion Team have relocated to the Sixth Form Block and Library where students will be moved to today.
Written by The Bewdley School | Published on 6th September 2019